Through the I-375 Reconnecting Communities Project, MDOT plans to convert the depressed I-375 freeway in Detroit to a street-level boulevard. The project provides a solution that considers safety, connectivity and operations while addressing existing and future transportation needs for all users.
Construction is currently planned to start in 2025.
In 2023, MDOT heard concerns about the number of lanes on the new boulevard from the community. Understanding that COVID-19 has had an impact on the way that people travel, over the past few months the project team collected new traffic data to determine if a reduction in lanes is feasible. The new data has indicated a reduction in the peak traffic volumes that provides the flexibility needed to reduce the number of lanes in the boulevard, rebuild with a smaller footprint, and increase local connectivity in the I-75/I-375 interchange area.
As MDOT moves into the next phases of the project, there will be many more opportunities for community input and participation. MDOT is planning several public meetings throughout the design and building of the project, including discussions on:
Upcoming meetings:
MDOT-I-375Corridor@Michigan.gov
855-375-6368
hello@baileyparkndc.org
Business Office
2200 Hunt Street Suite 411
Detroit, MI 48207
The Hub
2617 Joseph Campau
Detroit, MI 48207
The Park
2701 Elmwood
Detroit, MI 48207
Thank you for joining the Bailey Park NDC community. We look forward to seeing you soon.
All Rights Reserved | Bailey Park Neighborhood Development Corporation
Website Powered by: Ever Studios